House among the vines
A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.
- Place
- Saint-Cyr-au-Mont-d'Or
- Year
- 2025
- Materials
- Timber frame, larch cladding, wood fibre insulation
- 11 months on site

House among the vines, Saint-Cyr-au-Mont-d'Or, 2025
New houses, extensions and renovations, from the first sketch to the handover of the keys. Every project starts with a visit of the plot and a conversation.

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

A 38 m² kitchen and dining room opening onto the garden, under a building permit.
Missions
Each mission can be taken on its own. Fees are set in a written contract before any work begins.
1
On the plot or in your home. We listen, look, measure, and say what seems possible.
2
Plans and volumes, reworked with you until the house is yours. Each stage is validated in writing.
3
A complete application, filed and followed. Two months of review for a house, three for other buildings.
4
The builders priced on the same specification, then a site meeting every week, with minutes.
5
A careful visit, the reservations written down and lifted. The guarantees start that day.

Before you sign
Registered with the Order of Architects: the only way to carry the title, and a code of ethics that applies to every project.
Professional liability insurance is compulsory for architects. The certificate comes with the contract.
The mission, the stages and the fees are written down and signed before any drawing.
As a builder in the eyes of the law, the architect answers for ten years for damage that threatens the building.
For a building permit, unless you build for yourself 150 m² of floor area or less. An extension that takes you beyond counts too.
In their words
We came with a list of rooms. We left with a house that follows the sun through the day.
Every Thursday, the minutes of the site meeting were in our inbox. We always knew where things stood.
The permit was granted in two months, without a single request for missing documents.
A first meeting
The address of the plot or the building, what you would like to build, and roughly when. We reply within two working days to arrange a visit.